Optical Glass Spinning Top Base, Double Concave Crystal, Diameter 4.72"(120mm), Thicker 0.55"(14mm), Smoother Low Friction Helps Extend Spin Time, Impact-Resistant (L,White)

★★★★★ 4.8 41 reviews

US$9.60
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by telluridegallery.brownrice.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$9.60
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Dec 2
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by telluridegallery.brownrice.com
Free 30-day returns Details

Product details

Management number 209888126 Release Date 2026/04/02 List Price US$9.60 Model Number 209888126
Category
  • ★ High Quality: The spinning top base is made of K9 crystal optical glass, with greater hardness, greater wear resistance and better smoothness. High polishing by hand, the surface is very smooth and round.
  • ★ Double-sided Concave Design: The concave design of the surface prevents the spinning top from leaving the base during rotation, while helping the gyro find the center point faster during rotation, allowing you to have an excellent gaming experience. The curves of the double-sided concave are different, which can meet different styles of spinning top.
  • ★ Extended Gyro Rotation Time: The highly polished crystal glass is very smooth and has little friction, which can effectively extend the gyro rotation time and increase the record of your best time to a higher height.
  • ★ Easy To Use: Provide a larger diameter base, 10cm/3.94" and 12cm/4.72" respectively, with a large enough surface area to easily practice the gyro to prevents the gyro from falling off the base during startup due to its small surface area.
  • ★ Impact Resistance: Our crystal base is thicker and heavier, which can better withstand the impact of the gyro contacting the base when it starts; because most gyros are stainless steel or copper products, with high density and heavy weight, it has a large impact force when starting to spin, which is very easy to crack the thinner base.
  • ★ More Options: We provide six colors and two sizes of bases for gyro enthusiasts to choose. You can choose according to your favorite colors, proficiency and preferences to meet the different needs of customers.
Size Large
Color L, White
Brand Name CHEETOP
Item Weight 0.86 Pounds
Manufacturer CHEETOP
Material Type K9 Crystal
Item Dimensions 1.18 x 1.18 x 1.06 inches
Subject Character Fashion Personality
Included Components Spinning Top Base
Age Range Description Adult
Item Dimensions W x H 4.7"W x 0.54"H
Manufacturer Part Number Tai-Hi-01
Manufacturer Minimum Age MONTHS 24

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.8 out of 5
★★★★★
41 ratings | 17 reviews
How item rating is calculated
View all reviews
5 stars
87% (36)
4 stars
2% (1)
3 stars
1% (0)
2 stars
0% (0)
1 star
10% (4)
Sort by

There are currently no written reviews for this product.